WE ARE FULLY LICENSED AND INSURED

Relocation Checklist

NO HIDDEN COST

Embrace clarity in costs with our straightforward approach, ensuring no surprises along your moving journey.

WE VALUE YOUR FEEDBACK

Your invaluable feedback continuously shapes our services, driving an unwavering commitment to improvement.

TRANSPARENCY

Navigate your move with confidence, staying well-informed at every crucial juncture of your relocation.

Efficient moves

Rediscover time-saving moves through our streamlined process, ensuring a swift and effortless relocation for you.

OFFICE RELOCATION CHECKLIST

Moving an office is a full time project that requires superior organization and preparedness. Big Foot Moving & Storage, Inc. appreciates the magnitude and uniqueness of this type of relocation. We created a checklist including some of the most common tasks to assist you in moving your business. In addition to identifying and communicating floor plans, furniture placement, electrical/data/phone configurations, you may also consider taking the opportunity to thoroughly clean all office equipment.

Physical Planning

  • Obtain a floor plan of your current office layout
  • Obtain a blue print of your new office location
  • Create a proposed furniture orientation / office layout using blue print obtained
  • Obtain approval on new layout
  • Obtain quotes on required build out at new location
  • Determine PC and Printer Locations in new space
  • Determine location of shared office equipment (i.e. fax machines)
  • Identify personal printers on the floor plan
  • Identify analog lines on the floor plan
  • Identify data lines on the floor plan
  • Identify jack locations for voice and data
  • If modular furniture is being used, identify the network cabling
  • Obtain bids for any work that is required based on current plans
  • Review final space plans and include electrical and furniture placement
  • Begin compiling costs for move budget
  • Evaluate new location to determine if there are any special limitations for movers
  • Assign each new office space with an identification number
  • Record all of the information you have learned

Teams

  • Identify co-workers to be team members on project team
  • Have a backup team member for any one that may not be available
  • Establish a Computer Team – Responsible for all aspects of PC moves
  • Establish a Testing Team – Responsible for testing all workstations
  • Establish a Data Team – Responsible for ensuring all data is backed up
  • Establish a Printer Team – Responsible for installing and configuring all printers
  • Establish a Network Team – Responsible for all network equipment including testing
  • Establish an Employee Team – Responsible for communicating to employees and making sure all employee related issues are handled during move
  • Establish a Vendor Liaison – This person is responsible for interfacing with all vendors
  • Review all layout plans and jack locations for all equipment with team leaders
  • Create an outline for each team member and vendor as needed

Labeling For Move Day

  • Label all analog lines with ‘A’, digital phone lines ‘V’, and data lines ‘D’
  • All wiring should be labeled with the device ID to which it belongs
  • All wiring should be labeled with the location it will be moved in the new layout
  • All computer equipment should be labeled with the identification number assigned to the new space
  • Label all boxes and binders with the identification number of their new home
  • Color code labels for items belonging in network rooms or other common areas. Each color should correspond to a unique common space in the new location. At the new location the color should be clearly present on the door or wall space next to the door for easier unpacking.
  • Place each color on the building layout diagram you have created
  • Ensure all team members are familiar with coding system
  • Communicate color-coding system with Big Foot Moving & Storage, Inc. along with a copy of the layout

Wiring / Cabling / Phone / Internet / Etc.

  • Identify the telephone / server room at the new location and label it on the floor plan
  • Ensure that the new server room is centralized to avoid the Ethernet UTP length limit
  • Confirm minimum requirements for server room are met (electrical, cooling, dimensions, security, etc.)
  • Schedule wiring according to project timeline and obtain outside consultant if required
  • Identify cost and time constraints for wiring work
  • Document cost and time in project plan / project budget
  • Test all network and phone drops as soon as possible so problems can be corrected
  • Use layout of desks to estimate cable size requirements
  • Plan for any future configurations and wire leave additional wiring in each wall
  • Test all back-up batteries for phone switches and servers and take inventory of all items
  • Contact vendors for 800 numbers and schedule cutover date. Test the new phone lines several days before the move.
  • Disconnect all paid lines at old location
  • Review the programming and routing on the voice mail system to make sure everything is working as it should
  • Determine what type of Internet is available at the new location. If a T1 is required 6-8 weeks is often required notice.
  • If the ISP is changed from the current provider identify any changes that may be required to Company Website

Equipment

  • Take a complete inventory of all existing equipment
  • Determine what moves and what should be sold or donated
  • Identify any new equipment that may be required
  • Document all cost for project budget along with estimated arrival dates for project plan
  • Have a physical backup (bootable media) for all servers
  • Have spare cables and other parts on hand
  • You should not transport the backup media in the moving truck. Carry that by hand and if possible have two copies in two separate locations.
  • Review equipment repair orders and identify those items that are likely to have a problem on move day. Test those items first.

Meetings and Communication

  • Create a contact list for move day and include all key personnel, vendors, etc. on this sheet. Provide copies of this contact list to all team leads.
  • Vendor liaison should be on-site for deliveries or vendor access to new location
  • Create a phone number list of all numbers being moved. Use this list to test calls coming in to the correct locations in addition to making sure outgoing calls can be made.
  • Schedule a conference call with telephone service providers. Review plan for move. Schedule disconnection date for old location.
  • Reconfirm move date with all vendors at least 1 month prior to move. The week before the move make sure all vendors date sensitive tasks are complete and move is still on track.
  • Have a team meeting and confirm time lines are being met and roles and responsibilities are understood. Ensure everyone knows whom to call if there is a problem.
  • Update important information with office security systems and providers.
  • Have users back up all of their files to the network or to disks before the move.

Cleaning

  • Before electronic items are moved clean them with appropriate cleaner
  • Clean all office furniture prior to move
  • Clean all wall hangings prior to move
  • Clean all break-room / office kitchen items prior to move

GET YOUR FREE ESTIMATES HERE

MORE LINKS

RESOURCES

Debra M.
Debra M.
Read More
Choose Big Foot! Every team member is fabulous. From meeting with Nick, to packing and moving with Victor, Edwin and Eric. They rode it all out with me every step of the way. No problems or accidents! A smooth ride - as smooth as it can be!
Jennifer W.
Jennifer W.
Read More
We had a pretty extensive move and the crew Big Foot Moving and Storage sent was excellent. They were extremely nice, moved quickly and efficiently and took great care of all of our stuff. Would absolutely recommend to anyone looking for a quality, affordable moving company.
James G.
James G.
Read More
I have now used Big Foot Moving & Storage on two separate occasions and have been very pleased with the careful handling of my household goods to be moved. They were polite, professional, and responsive.